Hydraulic growth and expansion into solar development

Timelines: Energy timeline Hydraulic growth and expansion into solar development

2014-2017

  • 2014:
    • 22 MW hydroelectric power station acquired in Zeballos, Vancouver Island
  • 2015:
    • Commissioned a 50 MW solar power complex for a third party in southern California
  • 2017:
    • 3.4 MW hydroelectric power plant acquired in Emeryville, Maine
    • Two rooftop solar projects acquired in North Carolina with a combined capacity of 1.5 MW